Joseph Vaughn EdwardsPhone: 501-765-6779
Cell# Project Controls
email: jve0619@yahoo.com Planning, SchedulingValid
TWIC – Yes Career
Summary: Forty years’ experience in the oil, gas and chemical
industry. My experiences have taken me throughout the USA and overseas. My
career has evolved from millwright helper, field craftsman, supervision and now
project controls. Operate scheduling programs such as CMMS, Primavera 3.1 and
6.0. Experience with the use of MS Office programs. Strictly involved in
project controls since 1995. I have developed schedules for EPC construction
projects, capital projects, maintenance, and turnaround projects. Develop
schedules ranging from 30,000 man hours to 1MM plus man-hours. Developed WBS
activity code structures, resource leveling, reports and manpower requirement
reports. Tracked and reported earned values by earned man hour percent
complete. Developed reports for field productivity and overall schedule
percent complete. Adapted to and used various proven methods through out the
industry. Excellent communication skills along with being a team player. Education: Types of Projects: High School GraduateOil & Gas Industry
(Refineries) Petrochemical
Industry Industrial Courses:Polyolefin
Plant Supervision 1, 2 & 3 First Responder Hasmat / Haswoper Maximo CMMS Introduction to SAP Computer Skills:Work Environment: Primavera 3.1 & P6Maintenance CMMSTurnarounds Micro Soft Office (excel,word,powerpoint,etc.)Capital
Projects References: Eddie Bonvillian - Project Controls Specialist –
(504)235-8024 George Bruce - Project Controls Specialist –
(504)-296-3627 Steve Albin – Shell Oil – Project Controls – (225)
201-6163 Work History:
Project Controls B.P./Husky
Refinery – Toledo, OH Conoco Phillips – Wood River, IllFarmland Industries
– Coffeeville, KS Valero Refinery – Memphis, TNTexaco Offshore –
Morgan City, LA DP&L Power – Aberdeen, OHJG Summit – Batangas
City, Philippines Valero Refinery – Delaware City, DEGood Hope
Refinery – Norco, LA Hovensa Refinery – St. Croix, VIB.P. Refinery –
Belle Chasse, LA Premcor Refinery – Lima, OH Marathon Refinery, Ashland, KY Wyeth Pharmaceutical – Marietta, PA Conoco Refinery – Lake Charles, LA B.P. Chemical – Lima, OH Motiva Refinery – Gramercy, LA Genetics Institute – Andover, MA Agrium Chemical – Soda Springs, ID Exxon Refinery – Baton Rouge, La Sunoco Refinery – Toledo, OH RMF Contractors – Toledo, OH (2009 – 2014 ) Lead
Turnaround Scheduler – Develop P6 CPM resource loaded turnaround schedules.
Set baselines and track progress. Generate Earned Value and Percent Complete
reports. Belcan
Corp. – Wood River, Ill (06/08 – 3/09) Lead Scheduler -
Generated P3 schedules for progress tracking of the Revamp & Restart
portion of the CORE Expansion Project. Issue bi-weekly progress reports,
curves and material status to construction coordinators. Assist in progress
of
overall
integrated project schedule. Accurate Turnaround Management – Gretna, La. (06/07
– 4/08) Planner/Scheduler -
Plan and schedule refinery AFE projects and TAR using P3 software. Assist in
assembly of bid packages and coordinate contractor. Assist in
plant turnaround planning, generating work orders, material requisition and
track
in SAP. Headway Corp. Aberdeen, OH (12/06 – 06/07) Scheduler - Inherited
existing electrical schedule for multi-million dollar Air Quality Control
Project located at two power plants. Track progress; generate
weekly Look-a-head and progress curves. Develop new schedules as needed. High Bridge Assoc., Norcross, GA. 06/06 – 11/06) Planner/Scheduler –
Jacobs Engineering CO Boiler Cutover Project which includes the installation
of two FD Fans, followed by a boiler shutdown.
Generate P3 CPM schedule for both phases of the project. Coordinate between
contractors to progress and track schedule. Generate daily 3 day
look-a-heads,
resource load reports and progress curves. Universal Services, New Orleans, LA. (12/04 – 05/06) Planner/Scheduler - Assemble
detailed P3 schedule from Operation scope for their Fired,Waste Heat Boiler
and Gas Turbine Turnarounds. Enter Notification,
Work Orders and order material in clients SAP system. Generate cost
estimates,
daily Schedules and track progress. Coordinate all sub-contractor work
related to
each turnaround. CDI Engineering, Baton Rouge, LA. (03/02 – 07/02) Scheduler - Assemble
engineering and construction P3 schedules for upcoming $10M HVAC
modifications and upgrade to existing buildings. Track and update
during all phases. Jacobs Engineering, Baton Rouge, LA. (03/00 – 01/02) While employed with Jacobs I served as a project
planner/scheduler Traveling to various job location thru-out the U.S.
Duties included generating Primavera P3 schedules, histograms and progress
reports.
Planner/Scheduler – B.P. Chemical, Lima, OH. Planner/Scheduler – Motiva Refinery, Gramercy,
LA. Scheduler – Genetics Institute, Andover, MA. Planner/Scheduler – Agrium Chemical, Soda
Springs, ID Scheduler –Exxon Refinery, Baton Rouge, LA Scheduler – Jacobs/PCS, Lakeland, FL. Planner/Scheduler –
Exxon Refinery, Baton Rouge, LA. Turnaround
Management, Houston, TX (10/99 – 11/99) Planner/Scheduler – Farmland Refinery,
Coffeeville, KS. Perform evaluation of existing planning
department using Maximo CMMS for daily maintenance planning. Setup dummy
turnaround schedule for planners to practice for future outages. Meitec
Inc., New Orleans, LA (06/99 – 09/99) Planner/Scheduler – Texaco Offshore, Morgan
City, LA. Plan, estimate and schedule using Microsoft
Project, modifications of existing Electrical and instrumentation. Scope included
running new conduit and supports, Mounting new instruments and connections.
Issue and track daily
schedules to generate progress reports. Brown
& Root International, Houston, TX (09/96 – 05/99) Maintenance Planning Supervisor – JG Summit -
Batangas City, Philippines Responsible for setting up new maintenance
planning department at new Polyurethane/Polypropylene
Plastic Plant. Create and implement Work Order procedures.
Interview and hire department personal. Assist in setting up
warehouse procedures and stock item for maintenance. Train personal to use
Maximo CMMS program. Assist Maximo rep in setting up CMMS structure. Maintenance Planner – Exxon/Mobile Refinery -
Chalmette, LA. Receive work orders from Operation, order stock
and non-stock material, Issues sub-contractor bids, scope and track work
orders to completion. Southeast Louisiana Contractors, Norco, LA. (04/95 –
08/96) Planner/Scheduler – Good Hope Refinery, Norco, LA. Plan/schedule existing Crude Unit and Water
Treatment Plant Upgrades. Assemble schedule for API Tank Inspection and
repairs. Receive ISO’s, order material and implement into
existing schedules using P3 Finest Hour. Brown
& Root – Alliance Refinery, Belle Chasse, la. (04/74 – 06/95
Outside Machinist – Troubleshoot and repair pumps, compressors, turbines,
Fin fans and conveyors. Rebuilt equipment spares, mechanical seals and test
pressure relief valves.
Outside Machinist Supervisor – Responsible for the safety and supervision of
15 machinists, 2 lapping room techs. Issue daily job assignments, assist in
trouble shooting equipment, perform daily/weekly safety meeting.
Maintenance/Project Planner – Gather Operation scope to develop Turnaround
Schedules. Track and progress to completion work on PSV’s and equipment. Program: Maximo CMMS SAP Primavera P3 & P6.2 Types of Schedules: Level 1,2,3,4 Master with sub-projects EPC & Milestone Bid Proposals Job Related Training & Courses: Millwright
I
1974 Borg/Warner
Seals
1976 Prager
Gears
1978 Millwright
II
1978 Supervision
I
1980 Supervision
II
1984 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|